Improvement of Cost Calculation in Constructions – Application of the Standard Cost Method

Adela Breuer, Mihaela Lesconi Frumusanu, Jeanina Ciurea, Monica Rosu

Abstract


Grace to the analysis of several commercial companies effectively performed “on the field”, we could remark the necessity to change the method of cost calculation, our motivation being related to the simplification of calculations and the reduction of the labour volume, but especially the necessity to know in due time the deviations occurred as well as the causes having led to their apparition. The importance of knowing the deviations in due time results from the very basic characteristics of the constructions execution, i.e. the performance of works during several budgetary years, which leads to the modifications of prices and materials, the introduction of new technologies, and to the performance of open air activities, making the execution of constructions works be influenced by the atmospheric condition. But the most important aspect of knowing the deviations is the correct determination of expenses and their inscribing in the corresponding period, in view of determining the result of the budgetary year. Our proposal for the enhancement of the method of cost calculation in constructions is the application of the standard cost method in the variant “single standard cost”.

Keywords


construction works; cost calculation; standard cost

Full Text:

PDF


ISSN: 2344-1321 (online)